Huanghua, Hebei Wastewater Treatment Project

Wastewater Treatment
Project Overview
Construction Time2018Treatment Capacity50000m3/dInfluent QualityCOD≤80mg/L
Technology UsedZQQD Ozone catalytic oxidation TreatmentEffluent QualityCOD<30mg/L
Project DescriptionThis project treats industrial wastewater with a capacity of 50,000 m³/day. By adopting ZQQD ozone catalytic oxidation technology, COD is reduced from 80 mg/L to below 40 mg/L. The system operates stably, the effluent meets discharge standards, and the project has been running reliably for several years.
Contact Form
■Contact Form
Shopping Basket