Sichuan Industrial Park Water Supply & Wastewater Treatment Project

Industrial Park Water Supply
Project Overview
Construction Time2023Treatment Capacity25000m3/dInfluent QualityCOD ≤ 150 mg/L
Technology Used MOTIVA Ozone Catalytic Oxidation TechnologyEffluent Quality COD ≤ 50 mg/L
Project DescriptionThe total planned capacity of the wastewater treatment plant for this project is 50,000 m³/day, to be constructed in two phases: Phase I with 25,000 m³/day and Phase II with 25,000 m³/day. This design covers Phase I.The project will adopt MOTIVA ozone catalytic oxidation technology to ensure effluent quality, meeting the discharge standards for centralized industrial park wastewater treatment plants specified in the Sichuan Minjiang and Tuojiang River Basin Water Pollutant Discharge Standards (DB51/2311-2016).