Xinjiang Oilfield Wastewater Decolorization & COD Removal

Project Overview
Construction Time2021Treatment Capacity400 m3/dInfluent QualityCOD ≤ 5000 mg/L
Technology UsedZQQD three-dimensional electrolysis combined with SA03 ozone catalytic oxidation processEffluent QualityCOD < 2000 mg/L
Project DescriptionThis project treats 400 m³/day of produced water, which contains high concentrations of silica and COD. The alkalinity is high, with silica levels of 650–850 mg/L and COD around 5,000 mg/L. After treatment with ZQQD three-dimensional electrolysis combined with SA03 ozone catalytic oxidation, the effluent COD is reduced to <2,000 mg/L.